In This Guide
- Why Davie Is in the HVHZ — and What That Means
- Broward vs. Miami-Dade: Same HVHZ Code, Different Permit Office
- Town of Davie Permit Process (7 Steps)
- HOA & Community Approval Matrix
- Roofing Materials for Davie's Varied Housing
- Contractor License Verification
- 9 Red Flags to Reject a Bid Immediately
- Pre-1978 Homes & EPA RRP
- Wind-Mit Inspection & Insurance Savings
- The Robson Difference
- 10-Point Proposal Checklist
- Frequently Asked Questions
Davie is Broward's horse town, and that is not a marketing line, it is zoning. Roughly 105,000 residents, a Nova Southeastern University campus pulling in graduate students and faculty from across South America, and a Town Code that still lets homeowners keep horses on their own lot in neighborhoods like Imagination Farms and Long Lake Ranches. That goes back to 1925, when Davie got its start as a frontier farming town, and the character never left.
Here is what that means for your roof: three very different housing types, often a few streets apart. A 1960s-era CBS (concrete block and stucco) ranch home near a 1990s two-story suburban build, both a short drive from a million-dollar equestrian estate. Different deck conditions, different insurance exposure, different look the neighborhood expects. Each one needs its own plan, not a copy-paste bid.
What does not change, no matter which of those three houses you own, is the code underneath. Davie is in Broward County, and the Florida Building Code puts all of Broward, inland Davie included, in the High-Velocity Hurricane Zone alongside Miami-Dade. That means every product on your roof needs HVHZ approval, a Miami-Dade Notice of Acceptance (NOA) or an HVHZ-listed Florida Product Approval, and a contractor who tells you Davie is "not HVHZ" does not know Broward code. Get that right, understand how the Town of Davie Building Division runs its permit process, and know how HOA architectural review works in Davie's major communities, and you save weeks of delays and real money. This guide covers every step, written specifically for Davie by the licensed professionals at Robson Industrial Group LLC (CGC1541144 / CCC1337790), a Florida Certified General and Roofing Contractor serving Broward and Miami-Dade.
Why Davie Is in the HVHZ — and What That Means
The single most important regulatory fact every Davie homeowner must understand before signing a roofing contract is this: Davie IS in the High-Velocity Hurricane Zone (HVHZ). The Florida Building Code defines the HVHZ as Miami-Dade County and Broward County, both in their entirety. It is not a coastal strip, and Davie's inland location, twelve miles from the beach, does not take it out of the zone.
That has real consequences for your project. Every roofing product, from the covering to the underlayment, fasteners and edge metal, must be approved for HVHZ use: a Miami-Dade Notice of Acceptance (NOA), or a Florida Product Approval whose evaluation specifically covers the HVHZ (tested to the TAS protocols). HVHZ-approved products are tested to higher uplift and impact standards and must be installed exactly as the approval document specifies. A plain statewide FL approval with no HVHZ listing does not pass plan review at the Town of Davie, and Broward's Board of Rules and Appeals enforces the same standard county-wide.
A contractor who tells you Davie is "not HVHZ," or that ordinary Florida Product Approval is enough here, is either misinformed or working from a Palm Beach playbook, and should be disqualified immediately. The approval numbers (NOA or HVHZ-listed FL#) must appear on your permit application and in the contractor's proposal.
Wind design speeds in Davie are HVHZ speeds, roughly 170 mph and up (ASCE 7 Risk Category II; the exact figure for your parcel comes from the FBC wind-speed map). That is the same standard Miami builds to, and it is why the fastening schedules, underlayment assemblies and deck re-nailing on a Davie roof follow the HVHZ tables rather than the lighter ones used across the rest of Florida.
Table 1 — Broward vs. Miami-Dade: Same HVHZ Code, Different Permit Office
The table below compares Broward County (where Davie sits) with Miami-Dade. Both counties are the HVHZ; what changes at the county line is who reviews the permit and which product-approval database they expect to see, not the wind standard.
Table 1: Broward County (Davie) vs. Miami-Dade County — HVHZ Comparison
| Category | Broward County — Davie | Miami-Dade County |
|---|---|---|
| In the HVHZ? | Yes — entire county, inland Davie included | Yes — entire county |
| Product Approval System | HVHZ approval: Miami-Dade NOA, or Florida Product Approval with HVHZ listing (accepted by Broward BORA) | HVHZ approval: Miami-Dade Notice of Acceptance (NOA) — Miami-Dade Product Control |
| Design Wind Speed | HVHZ speeds, roughly 170 mph and up (ASCE 7 Risk Category II; parcel-specific per FBC map) | HVHZ speeds, roughly 170 mph and up (ASCE 7 Risk Category II; parcel-specific per FBC map) |
| Fastener Specification | Per the NOA / HVHZ approval; enhanced HVHZ nailing pattern for shingles, tile and metal | Per the NOA; enhanced HVHZ nailing pattern for all systems |
| Underlayment | HVHZ underlayment assembly per the approval; self-adhered ply typical | HVHZ underlayment assembly per the approval; self-adhered ply typical |
| Deck Nailing | Re-nail to the HVHZ schedule (8d ring-shank, tightened spacing) at re-roof | Re-nail to the HVHZ schedule (8d ring-shank, tightened spacing) at re-roof |
| Permit Jurisdiction | Town of Davie Building Division · 6591 Orange Dr · (954) 797-1050 | Miami-Dade County Building Dept. or the municipal building dept. |
| Insurance Impact | Wind-mit inspection (OIR-B1-1802) can yield 15–35% premium reduction | Same wind-mit process and credits |
Town of Davie Permit Process — 7 Steps
All roofing work in Davie requires a permit from the Town of Davie Building Division, located at 6591 Orange Dr, Davie, FL 33314, reachable at (954) 797-1050. Davie's permit office handles a significant volume for a municipality of its size, and typical review timelines run 3–5 weeks, slightly longer than smaller Broward cities. Plan accordingly and never allow a contractor to begin work before a permit is issued and posted.
Scope & Estimate
Contractor performs on-site inspection, photos existing roof, measures square footage, identifies deck condition, and prepares detailed written scope.
HVHZ Product Approval Selection
Contractor selects a shingle, tile, or metal system with a current Miami-Dade NOA or an HVHZ-listed FL Product Approval, and pulls the approval document for every component.
Permit Application
Licensed contractor (CCC1337790) submits permit application to Town of Davie Building Division with product approval docs, insurance, and license.
HOA Pre-Approval (if required)
If your community has an HOA with Architectural Review, ARC approval is obtained before or concurrent with permit submission. See Table 2.
Permit Issuance (~3–5 weeks)
Town of Davie reviews plans and issues permit. Permit card is posted at the property before work begins. Inspections are scheduled via the town portal.
Installation & Inspections
Work proceeds per approved plan. Town inspector conducts at minimum a dry-in inspection and a final inspection. Contractor coordinates scheduling.
Final Sign-Off & CO
Town issues final approval. Owner receives wind mitigation inspection, eligible for insurance savings. Permit record is public and searchable.
HOA & Community Approval Matrix
Davie is notably more varied in HOA density than many South Florida cities. Large-lot and equestrian properties, especially those zoned A-1 or R-1, frequently have no HOA at all, giving homeowners maximum material flexibility. However, Davie's planned communities and gated subdivisions do maintain active Architectural Review Committees (ARCs), and submitting to the Town permit office without ARC approval first can result in costly delays or mandatory redo orders.
Table 2: Davie Community HOA / Architectural Review Matrix
| Community | HOA / ARC | ARC Approval Process | Timeline | Common Restrictions | Approved Materials |
|---|---|---|---|---|---|
| Rolling Hills Estates | HOA Active | Submit ARC form + color sample + contractor license to HOA management company before permit | 10–21 days | Color must match or complement existing community palette; no bright metallics | Concrete tile (preferred), architectural shingles in approved earth tones, muted metal |
| Hawkes Bluff | HOA Active | Written ARC application with product spec sheet; email submission accepted | 7–14 days | Material must match at least 75% of existing homes in section; tile preferred | Concrete tile, clay tile; dimensional shingles require ARC pre-clearance |
| Country Isles | HOA Active | ARC submission with product sample board; board meets monthly | 14–30 days | Strict color uniformity within each section; metal roofing generally not approved | Concrete tile (dominant), select architectural shingle colors |
| Pine Island Ridge (55+) | HOA Active — Strict | ARC application, onsite board review; must attend meeting for non-like-for-like changes | 21–45 days | Like-for-like replacement preferred; any material change requires full board vote; very active enforcement | Concrete tile, asphalt shingle in approved colors; metal not typical |
| Long Lake Ranches | HOA Active — Luxury | Detailed ARC submission; licensed contractor required; product brochures + rendering may be requested | 14–28 days | High aesthetic standard; premium materials expected; installer qualifications reviewed | Clay tile, concrete tile, premium metal standing-seam; GAF System Plus warranty a differentiator |
| Non-HOA Equestrian Lots | No HOA | No ARC process — Town of Davie permit only | N/A | FBC HVHZ wind code only; full material flexibility within HVHZ-approved products | Metal (standing seam, exposed fastener), tile, shingle — owner's choice |
Before committing to a material or color, confirm your HOA status by checking your deed, contacting your HOA management company, or searching the Broward County Property Appraiser records. Robson Industrial Group navigates ARC processes as part of every project at no additional charge.
Roofing Materials for Davie's Varied Housing Stock
Davie's housing market spans more than six decades of construction, from 1960s single-story CBS ranch homes to the sprawling equestrian estates of Long Lake Ranches. No single roofing system is right for all of them. The table below breaks down optimal material choices by property type, accounting for structural capacity, wind performance, HOA compatibility, and long-term value.
Table 3: Roofing Materials by Davie Property Type
| Property Type | Best Material Options | Lifespan | Wind Performance | Estimated Cost Range | HOA Compatibility |
|---|---|---|---|---|---|
| 1960s–1970s CBS Ranch Single-story, low-pitch, older decking |
Architectural asphalt shingles (GAF Timberline HDZ or equivalent); lightweight metal if deck allows | 25–35 yrs (shingle); 40–70 yrs (metal) | Meets HVHZ uplift requirements when installed to the NOA nailing schedule; verify deck condition first | $9,000–$16,000 (avg. 1,800 sq ft) | Generally compatible; confirm HOA if present |
| 1980s–2000s Larger Suburban 2-story, hip roofs, hip extensions common |
Concrete tile (popular in Davie HOA communities); architectural shingles for budget-conscious | 40–50 yrs (tile); 25–35 yrs (shingle) | Concrete tile set per its NOA (foam-adhesive or mechanical) meets HVHZ uplift; shingle with the HVHZ nailing pattern | $14,000–$28,000 (tile); $11,000–$20,000 (shingle) | Excellent for HOA communities; tile is predominant preferred material |
| Luxury / Long Lake Ranches Large footprint, premium aesthetic expected |
Clay tile, premium concrete tile, standing-seam metal; GAF System Plus warranty with GAF ID 1164276 | 50–100 yrs (clay/metal); 40–50 yrs (concrete tile) | Excellent across all categories when properly installed | $28,000–$70,000+ depending on system and footprint | Required by most luxury HOAs; premium finishes expected |
| Equestrian / Rural Large-Lot Non-HOA; large structures; rural aesthetic |
Standing-seam metal (steel or aluminum); exposed-fastener metal for agricultural structures | 40–70 yrs | Superior — standing-seam achieves the highest uplift ratings among NOA / HVHZ-approved systems | $15,000–$40,000+ depending on roof complexity and size | No HOA restriction; metal ideal for equestrian aesthetic and longevity |
Notes on CBS Ranch Homes (1960s–1970s)
Many of Davie's original CBS ranch homes were built with skip-sheathing (1×6 boards with gaps) or early thin OSB that has degraded over 50–60 years. Before any re-roofing, a qualified contractor should inspect the deck and include deck replacement or reinforcement in the scope if needed. Skipping this step leads to failed inspections, additional costs mid-project, and voided warranties.
Additionally, homes built before 1978 may contain lead-based paint on fascia, soffits, and trim that can be disturbed during tear-off. Florida and federal regulations require an EPA RRP-certified contractor to manage any lead-paint disturbance. Robson Industrial Group holds EPA RRP certification #NAT-F338229-1 (expires 6/23/2031), certified for purposes of Section 402 of TSCA. We handle pre-1978 properties under full compliance. See the Pre-1978 section below for full detail.
GAF Certified™ Contractor Advantage
As a GAF Certified™ Residential Roofing Contractor (GAF ID 1164276), Robson Industrial Group can register the GAF System Plus™ Limited Warranty on qualifying GAF systems, an enhanced manufacturer warranty on the GAF materials in the roof, with longer non-prorated coverage than the standard shingle warranty. It does not cover workmanship; that is covered separately by Robson's own written workmanship warranty, with the term stated in your contract. For Long Lake Ranches, luxury communities, or any homeowner who plans to sell within 10 years, System Plus is transferable subject to GAF's transfer terms, which adds value at resale. Ask for GAF ID 1164276 on your proposal to confirm you are getting the certified installer benefit.
Florida Contractor License Verification
Florida requires anyone performing roofing work in Davie to hold an active, appropriate state license, and verifying that license yourself takes under three minutes. Any contractor who objects to license verification is a contractor to walk away from immediately.
Table 4: Florida Contractor License Types Explained
| License Type | Abbreviation | Scope of Work | Robson Industrial Group |
|---|---|---|---|
| Certified General Contractor | CGC | General contracting statewide — structural, additions, commercial, residential; a CGC without a roofing license must subcontract the roof to a licensed roofer (F.S. 489.113(3)) | CGC1541144 — Current, Active, held alongside CCC1337790 |
| Certified Roofing Contractor | CCC | The roofing license of record — shingles, tile, metal, modified bitumen, TPO, flat systems on any structure; statewide; the license that performs the roof and pulls the roofing permit | CCC1337790 — Current, Active |
| Registered Contractor | RC (various) | Licensed only in specific county/jurisdiction; not statewide; must register with each local authority | N/A — Robson holds Certified (statewide) licenses |
| Subcontractor / Specialty | Varies | May hold a trade license (electrical, plumbing) but NOT authorized to act as the roofing contractor without a CCC | All work performed under CGC1541144 / CCC1337790 |
7-Step DBPR License Verification Process
- Navigate to myfloridalicense.com and click "Verify a License."
- Select "Construction Industry Licensing Board" from the board dropdown menu.
- Enter the contractor's license number — for Robson Industrial Group that is CCC1337790 (Roofing) and CGC1541144 (General).
- Confirm the license type is a Certified Roofing Contractor (CCC). A CGC alone does not cover the roof; a general contractor without a roofing license must subcontract it to a licensed roofer, so ask who the roofer of record is.
- Verify status shows "Current, Active" — not expired, suspended, or revoked.
- Confirm the licensee name matches the company on your contract. License holders may not lend their license to unlicensed crews.
- Request current certificates of general liability insurance and workers' compensation with your name as the additional certificate holder. Call the insurer directly to confirm coverage is in force.
9 Red Flags — Reject the Bid Immediately
Storm chasers and unlicensed operators are active throughout Broward County after every named storm. These are non-negotiable disqualifiers: a single red flag is sufficient reason to walk away.
- No FL license number on the written proposal. Every Florida roofing contractor must display their license number (a CCC for the roofing work) on all advertising, proposals, and contracts. Absence is automatic disqualification.
- "Davie isn't HVHZ — regular Florida Product Approval is fine here." False. All of Broward County is in the High-Velocity Hurricane Zone, and every product needs a Miami-Dade NOA or an HVHZ-listed FL approval. This statement reflects either incompetence or a contractor who will fail your plan review.
- Demands full payment upfront. Florida law (F.S. 489.126) does not cap deposits, but a contractor who takes more than 10% up front must apply for the permit within 30 days of that payment and start work within 90 days after the permit is issued. A demand for full payment before work starts is a fraud signal.
- Offers to skip the permit to "save you time." Unpermitted roofing work voids manufacturer warranties, creates title defects, and exposes you to fines and forced tear-off. There is no legitimate reason to skip a permit.
- No product approval number listed. Every roofing product installed in Davie must carry a current Miami-Dade NOA or an HVHZ-listed FL Product Approval. If the contractor cannot provide it, the system may not meet code.
- Handles pre-1978 homes without EPA RRP certification. Lead-paint disturbance without EPA certification is a federal violation. Always verify EPA RRP status for older homes.
- No written scope of work — only a total price. A legitimate proposal itemizes tear-off, disposal, decking inspection, underlayment, system specification, fastener pattern, and warranty terms.
- Promises a GAF System Plus warranty but can't provide their GAF ID. Only verified GAF Certified™ Residential Roofing contractors can issue System Plus warranties. Ask for the GAF ID number and verify at gaf.com. Robson Industrial Group's GAF ID is 1164276.
- Workers' comp certificate is "exempt" for a crew of any size. A sole proprietor with no employees may be genuinely exempt, but any crew working on your property should be covered by workers' comp. If they're injured on your property without coverage, you may be liable.
Pre-1978 Homes & EPA RRP Certification
A meaningful portion of Davie's housing stock was built in the 1960s and early 1970s: CBS ranch homes on generous lots that defined the town's early character. Statistically, homes constructed before 1978 have a moderate to high likelihood of containing lead-based paint on exterior surfaces including fascia boards, soffit panels, window trim, and door frames. These are precisely the surfaces that roofing crews disturb during tear-off and replacement.
Under the EPA Renovation, Repair, and Painting (RRP) Rule (40 CFR Part 745, implementing Section 402 of TSCA), any firm performing renovation work that disturbs more than 6 square feet of painted surface in a pre-1978 home must be certified by the EPA and use trained, certified renovators. The rule applies to roofing contractors when soffit, fascia, or other painted surfaces are disturbed during installation.
When evaluating bids for your Davie 1960s–1970s home, ask each contractor to confirm their EPA RRP firm certification number and expiration date. Verify it against the EPA's national firm database. A contractor performing roofing work on a pre-1978 home without RRP certification is violating federal law, and the liability for improper lead disturbance can follow the homeowner as well as the contractor.
Wind-Mit Inspection & Insurance Savings
One of the most financially significant steps a Davie homeowner can take immediately after a permitted re-roof is scheduling a wind mitigation inspection. Florida insurance carriers use the OIR-B1-1802 form (completed by a licensed inspector) to evaluate your home's resistance to hurricane-force wind damage. The form documents roof covering type, deck attachment, roof shape, roof-to-wall connections, and opening protections.
A new roof with proper deck attachment, HVHZ-approved self-adhered underlayment, and a hip roof shape (very common in Davie's CBS ranch homes) can qualify for 15–35% reductions in the wind portion of your homeowners insurance premium. On a typical Davie policy, that can translate to $400–$1,200 or more in annual savings, quickly offsetting a significant portion of your roofing investment.
Key Wind-Mit Credits for Davie Homeowners
- Roof Covering: FBC-compliant systems installed after 2002 receive maximum credit
- Roof Deck Attachment: 8d ring-shank nails at 6" on-center at edges qualifies for highest credit tier
- Roof Shape: Hip roofs (sloped on all four sides) receive the maximum shape credit vs. gable or flat
- Roof-to-Wall Connection: Single wraps, double wraps, clips, or structural connections each carry different credit
- Opening Protection: Impact windows and doors (installed by Robson Industrial Group under CGC1541144) can stack additional discounts
Robson Industrial Group coordinates wind mitigation inspections for clients following project completion. If your current roof is 5+ years old and you've never had a wind-mit inspection, contact us. You may already qualify for savings you're not receiving.
The Robson Difference — Davie Roofing Done Right
Robson Industrial Group LLC is a Florida-licensed general and roofing contractor headquartered in Miami-Dade, serving Broward and Miami-Dade counties. We are not a storm-chaser operation that appears after hurricanes and disappears. We are a full-service, licensed contractor with deep roots in South Florida's construction and regulatory environment.
Certified General Contractor
CGC1541144: Florida Certified, statewide authority. Structural work, windows/doors, and general scope around the roof.
Certified Roofing Contractor
CCC1337790: Florida Certified Roofing Contractor, the roofing license of record. All system types: shingle, tile, metal, flat.
GAF Certified™ Contractor
GAF ID 1164276: authorized to register the GAF System Plus™ Limited Warranty (GAF materials); workmanship covered by Robson's own written warranty.
EPA RRP Certified Firm
#NAT-F338229-1, exp. 6/23/2031. Pre-1978 homes handled under full lead-paint compliance (TSCA §402).
Financing
Financing may be available through third-party providers, subject to their approval and terms. Ask us for details.
We Handle Everything
From HOA ARC applications to Town of Davie Building Division permit to final inspection sign-off, you do not attend a single meeting.
Financing may be available through third-party providers, subject to their approval and terms. Ask us for details.
10-Point Roofing Proposal Checklist
Before signing any contract, verify that the written proposal includes all ten of the following items. A proposal missing even two or three of these elements should be returned for revision, or the contractor should be replaced.
Table 5: Roofing Proposal Review Checklist, 10 Required Items
| # | Required Item | What to Look For | Red Flag if Missing |
|---|---|---|---|
| 1 | Florida License Number(s) | CCC (roofing) number printed on proposal header, plus CGC if the job includes structural scope; verify at myfloridalicense.com | Unlicensed contractor; no warranty protection |
| 2 | HVHZ Product Approval | Miami-Dade NOA or HVHZ-listed FL# for the specific shingle, tile, or metal system being installed | System may not meet the FBC HVHZ wind code |
| 3 | Permit Inclusion | Explicit statement that contractor will pull Town of Davie permit; no owner-builder | Unpermitted work; void warranties; title defect |
| 4 | Tear-Off and Disposal Scope | Number of layers to be removed; disposal method; dumpster or haul-away included | Hidden charges mid-project; dump-on-site disputes |
| 5 | Deck Inspection Statement | Language committing to deck inspection; per-sheet pricing for replacement if needed | Decking cost surprises; failed inspection; voided warranty |
| 6 | Underlayment Specification | Product name, weight/type (30#, synthetic, self-adhered), number of plies | Non-compliant system; reduced wind protection |
| 7 | Fastener Specification | Nail type, length, and pattern (e.g., 8d ring-shank, 6" edge spacing) | Wind uplift failures; code violation at inspection |
| 8 | Manufacturer Warranty Terms | Length (e.g., 30-year, lifetime), transferability, what is and is not covered; GAF System Plus if applicable (GAF ID 1164276) | No recourse for material failure; non-transferable at resale |
| 9 | Workmanship Warranty | Contractor's own labor warranty — minimum 2 years; 5 years is industry standard for quality firms | No accountability for installation defects |
| 10 | Payment Schedule | Modest deposit at signing (over 10% triggers the F.S. 489.126 clock: permit application within 30 days, start within 90 days of permit issuance); balance tied to project milestones; no full payment before final inspection | Fraud signal; contractor may disappear with deposit |
Frequently Asked Questions — Davie Roofing
Yes, and people get this wrong constantly. Davie is in Broward County, and the Florida Building Code defines the High-Velocity Hurricane Zone as Miami-Dade County and Broward County, both in their entirety. Davie's inland location changes nothing about the wind code. Every roofing product on a Davie roof must be approved for HVHZ use: a Miami-Dade Notice of Acceptance (NOA), or a Florida Product Approval whose evaluation specifically covers the HVHZ.
Here is the practical difference: a plain statewide FL Product Approval, the kind that is fine in Orlando or Tampa, has no HVHZ listing and does not pass plan review at the Town of Davie. Any contractor telling you Davie is "not HVHZ" or that ordinary FL approval is enough either does not understand Broward code or is about to fail your inspection. Robson Industrial Group (CCC1337790 / CGC1541144) specifies NOA or HVHZ-listed systems for all Davie projects, full stop.
Budget approximately 3–5 weeks with the Town of Davie Building Division, located at 6591 Orange Dr, Davie, FL 33314, reachable at (954) 797-1050. Davie processes a relatively high volume of permits for its population size, and that review cycle runs a little longer than you would see in smaller Broward municipalities, especially on larger or more complex roofing projects. After a storm, add more time, every Broward Building department is working through the same surge at once.
Robson Industrial Group (CGC1541144 / CCC1337790) handles the whole permit side for you: applications, plan submissions, inspection coordination. We submit complete, first-time-pass packages to minimize review cycles, and we track every permit's status so you do not have to.
Davie's equestrian and agricultural zoning (A-1, A-5, and related designations) governs land use and the keeping of livestock, not your roof. All structures in Davie, regardless of zoning, must meet the same FBC HVHZ wind-load requirement, design speeds roughly 170 mph and up (ASCE 7 Risk Category II; parcel-specific per the FBC wind-speed map), built with NOA or HVHZ-listed roofing systems. No equestrian exemption exists.
Where the equestrian context does change things is material preference. Standing-seam metal roofing is the clear favorite among Davie's large-lot and equestrian property owners: 40–70 year lifespans, industry-leading wind uplift resistance under its NOA, and an aesthetic that fits the rural character of the neighborhood instead of fighting it. Adjacent outbuildings, barns, and agricultural structures may trigger separate permit reviews depending on their use classification. Robson Industrial Group (CGC1541144) has worked Davie's equestrian-zone properties and the multi-structure projects that come with them.
Two strong options for Davie's CBS ranch homes from the 1960s and 1970s: architectural asphalt shingles or lightweight metal roofing. Both are cost-effective, both are available with Miami-Dade NOAs for HVHZ use, both work well with the low-pitch profiles common on ranch homes.
Before committing to either, the existing roof deck needs an inspection, no exceptions. Many of these homes were built with 1×6 skip-sheathing or early OSB that has degraded over decades and may need to be replaced or overlaid with plywood before a new system can go down. Get that step written into your proposal scope with a clear per-sheet replacement price.
If your home was built before 1978, re-roofing can disturb lead-based paint on fascia, soffit, or trim. Federal EPA RRP regulations require that work be performed by an EPA-certified firm. Robson Industrial Group holds EPA RRP certification #NAT-F338229-1 (expires 6/23/2031), certified for purposes of Section 402 of TSCA, and we handle pre-1978 Davie properties under full regulatory compliance. Once the new roof is on, a wind mitigation inspection can reduce homeowners insurance premiums 15–35%.
Three minutes, start to finish.
Step 1: Navigate to myfloridalicense.com and click "Verify a License." Step 2: Select "Construction Industry Licensing Board." Step 3: Enter the license number (e.g., CCC1337790 or CGC1541144 for Robson). Step 4: Confirm the license type is a Certified Roofing Contractor (CCC): that is the license that performs roofing and pulls the roofing permit; a general contractor (CGC) without a roofing license must subcontract the roof to a licensed roofer under F.S. 489.113(3). Step 5: Verify status shows "Current, Active." Step 6: Confirm the licensee name matches the company on your contract. Step 7: Request certificates of general liability and workers' compensation insurance naming you as certificate holder, and call the insurer directly to confirm coverage is active, do not skip that call.
Robson Industrial Group LLC holds both CGC1541144 and CCC1337790, both current and active statewide. In addition, verify our GAF Certified™ Residential Roofing Contractor status at gaf.com using GAF ID 1164276, and our EPA RRP firm status at cfpub.epa.gov/flpp/ using firm name "Robson Industrial Group."
Ready for a Free Davie Roof Estimate?
Robson Industrial Group handles everything: permit, HOA submission, inspections, and a GAF System Plus warranty option. Licensed under CGC1541144 and CCC1337790. Serving all of Davie and Broward County.
GAF ID 1164276